K-Type Thermocouple Probe With Inner Core Protection Long Lead Wire High Temperature Resistant For Industrial Lab Use
FREE Shipping
K-Type Thermocouple Probe With Inner Core Protection Long Lead Wire High Temperature Resistant For Industrial Lab Use
- Brand: Unbranded
K-Type Thermocouple Probe With Inner Core Protection Long Lead Wire High Temperature Resistant For Industrial Lab Use
- Brand: Unbranded
Save CZK275.00 (32%)
RRP
14-Day Returns Policy
Save CZK275.00 (32%)
RRP
14-Day Returns Policy
We accept the following payment methods
Description
K-Type Thermocouple Probe With Inner Core Protection Long Lead Wire High Temperature Resistant For Industrial Lab Use
- Brand: Unbranded
- Category: Motor Vehicle Sensors & Gauges
- Fruugo ID: 392216872-839203853
- EAN: 198579167269
Delivery & Returns
Dispatched within 24 hours
-
STANDARD: FREE - Delivery between Wed 24 December 2025–Fri 09 January 2026 - FREE
Shipping from China.
We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy
Product Compliance Details
Please see the compliance information specific to this product outlined below.
The following information is provided by the independent third-party retailer selling this product.
Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.
- GlowGrove
- Shenzhen Tumi Technology Co., Ltd.
- 202-03, Jinhe Building, 8 Xinhe Street, Maan Tang, Bantian
- Longgang, Shenzhen, Guangdong
- China
- Shenzhen
- CN
- 518129
- pettynfnef@outlook.com
- 13332965772
Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.
- Synertrade FR SAS
- Synertrade FR SAS
- 9 rue du Bat d'Argent
- Lyon
- France
- Lyon
- FR
- 69001
- info@syner-sarl.cn
- (+33)774555006
- https://seller.kuajingmaihuo.com/settle/qualification-service